Difference between revisions of "External Flooding PRA Methods"
Jump to navigation
Jump to search
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | The following methods have been reported to EPRI as having been evaluated to determine whether they are NDMs or not. Available information on the basis for determining that a method is or is not an NDM and a summary of any completed NDM Peer Reviews are included as provided to EPRI by the party making the determination or conducting the NDM Peer Review. | ||
+ | |||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
− | ! Date !! Title !! Description !! | + | ! Date !! Title !! Description !! Implementing Document !! Is this a “Newly Developed Method (NDM)”? !! Link to NDM Decision Justification !! Has a NDM Peer Review been conducted? !! Link to NDM Peer Review Public Summary |
|- | |- | ||
− | | | + | | || || || || || || || | |
Latest revision as of 11:04, 18 October 2021
The following methods have been reported to EPRI as having been evaluated to determine whether they are NDMs or not. Available information on the basis for determining that a method is or is not an NDM and a summary of any completed NDM Peer Reviews are included as provided to EPRI by the party making the determination or conducting the NDM Peer Review.
Date | Title | Description | Implementing Document | Is this a “Newly Developed Method (NDM)”? | Link to NDM Decision Justification | Has a NDM Peer Review been conducted? | Link to NDM Peer Review Public Summary |
---|---|---|---|---|---|---|---|