External Flooding PRA Methods: Difference between revisions
Jump to navigation
Jump to search
en>NDMAdmin No edit summary |
m (1 revision imported) |
(No difference)
| |
Latest revision as of 22:02, 9 October 2026
The following methods have been reported to EPRI as having been evaluated to determine whether they are NDMs or not. Available information on the basis for determining that a method is or is not an NDM and a summary of any completed NDM Peer Reviews are included as provided to EPRI by the party making the determination or conducting the NDM Peer Review.
| Date | Title | Description | Implementing Document | Is this a “Newly Developed Method (NDM)”? | Link to NDM Decision Justification | Has a NDM Peer Review been conducted? | Link to NDM Peer Review Public Summary |
|---|---|---|---|---|---|---|---|